Installation Process

The Forest Roofs 5-step installation process.

  • roof-installation-process-1-crew-arrival

    Arrival

    The crew and the project manager arrive in the morning and create a game plan.


    The Installation Process usually takes 1-2 days

  • roof-installation-process-2-tear-off

    Tear Off

    The current roof is torn off. This is the messy part where most problems occur. It is very important to stay away from the job as materials are flying everywhere.


    The Installation Process usually takes 1-2 days

  • roof-installation-process-3-deck-inspection

    Inspection

    The crew will inspect your decking to ensure that there is no rot, and that we
    are nailing to a solid nailable surface.


    The Installation Process usually takes 1-2 days

  • roof-installation-process-4-install

    Installation

    First the roof is “dried in.” This means the felt is covering the roof, and the drip edge is installed - making it water tight. After this the shingles and other components are installed.


    The Installation Process usually takes 1-2 days

  • roof-installation-process-5-clean-up

    Clean Up

    At this point, the yard is rolled with a magnetic roller to pick up nails, the job is inspected by the foreman, and the crew leaves. The job is also inspected by the project manager. Also, it is important to note that the owner inspects every roof that is built.